WHAT DID THE PROJECT ENTAIL? Springbokwasser for Ministry of Environment and Tourism HOW LONG DID THE PROJECT TAKE? 16 months / 18 month contract HOW MUCH CEMENT WAS USED? 6000 bags Vari...
PROJECT DISCRIPTION: The building is a combination of office space and residential flats build on top of basement parking. (Mixed Development) PROJECT ETA: 12 Months AMOUNT OF CEMEN...
PROJECT DESCRIPTION: 6 reservoirs to upgrade extra water process facility CEMENT USED: +-5000cub concrete. Ohorongo CEM IR with 30% Fly Ash blend was used PROJECT ETA: 8 months AMOUN...
The new Oncology Centre in Khomasdal was built with Ohorongo CEM II B-V 42.5N. - Mix Design by an approved material testing laboratory Concrete Specifications: - Minimum Strength ...
PROJECT DESCRIPTION: Nampower substation for line for supply from central Namibia CEMENT USED:+-3000 cub including mortar mixes to date. Ohorongo CEMIR with 30% Fly Ash blend used. 30% Fl...
Hilltop Village only recently started construction and is planned to be a commercial property providing offices and a shopping mall experience. The estimated concrete to be used; ...
The new development consists of offices for the Capricorn Group. The estimated quantities that went into completing the project is; - 30M...
Nedbank Campus Namibia is a newly built building consisting of offices and 5 parking levels with cantilever slab. Overall concrete used totaled; - 1...
PROJECT DESCRIPTION: It is part of the Namport road project to assist with goods to be delivered to the north of Namibia and other SADDEC countries CEMENT USED: CEMIR with 30% Fly Ash blend ...
Located in the Karas region along the Fish River in the south of the country, the project is the first phase of the Neckartal Irrigation Scheme. Made from roller-compacted concrete (RCC) and sta...
The Husab Uranium Project is an Uranium mine (“the Hasab Mine”) under development near the town of Swakopmund in the Erongo region, in western-central Namibia. The mine is being deve...
The Expansion Project will include the construction of a new container terminal incorporating an additional 40 hectares of land with a quay length of 2100 m. The new container terminal will acco...
Wernhil Park Mall Phase 4 consisted of alterations and additions to the existing mall. Approximate concrete quantities used; - 2MPa soilcrete = 1 40...
Platz am Meer consists of a two-level shopping Centre, offices, 3 levels of luxury apartments and a two-level parking structure. A new breakwater with boat launch was also constructed...
Walvis Bay Airport was the construction of concrete aprons, civil works and earthworks. CEM I 42.5R Ohorongo cement was used for a 60MPa concrete mix with approximate quantities of; - &...
The construction of new Architectural and Engineering Buildings for Polytechnic of Namibia consisted of concrete totaling; - 10MPa concrete = 186m&s...
Grove mall bulk earthworks and services including a Semi Purified Concrete Water Storage Reservoir. For this project 42.5N CEM II Ohorongo cement for 450m³ of concrete was used a...
These are the Lastest Ohorongo Projects.
These are the Top Viewed Ohorongo Projects.
Ohorongo (Pty) Ltd. is one of the first of Namibia's cement manufacturers and owns one of the most modern cement plants in Africa. It was constructed over the course of two years by leading international engine...